April 2014

Monthly Construction and Environmental Update West End (Station 2137 at SR 79 to Station 2190) Gas utility contractor relocation work ongoing near SR 79 utilizing both open trench and directional bore methods of installation. Utility construction-related traffic...

May 2014

Monthly Construction and Environmental Update West End (Station 2137 at SR 79 to Station 2190) Gas utility contractor relocation work ongoing near SR 79 utilizing both open trench and directional bore methods of installation. Utility construction-related traffic...

June 2014

Monthly Construction and Environmental Update West End (Station 2137 at SR 79 to Station 2190) Gas utility relocation work ongoing near SR 79 utilizing both open trench and directional bore methods of installation. Utility construction-related traffic control and...

July 2014

Monthly Construction and Environmental Update West End (Station 2137 at SR 79 to Station 2190) Gas utility contractor relocation work ongoing near SR 79 utilizing both open trench and directional bore methods of installation. Utility construction-related traffic...

August and September 2014

Monthly Construction and Environmental Update West End (SR 79)West End (SR 79) Cross drain pipe and culvert extensions on south end of SR 79 have been completed. Temporary Sediment Basins 31 and 32 (west side of Hwy 79, south of BNB interchange) have been installed....