BNB COG members discussing project

View looking east from station 2180 at area of future bridge (Observation Stop #3)

Soil Nail Wall near station 2210

Removal of temporary work bridge at Observation Stop #2

Mainline at finished grade with gravel stabilization; drainage structure shown in center of photo.

View looking east of Mainline at finished grade through rock cut area near station 2160 (Observation Stop #2)