Nearly-completed access road serving residences near Highway 79. Ramp to the mainline at the right

Section at final grade with pneumatic concrete blanket and soil walls. Side drain pipes soon will be installed

Finishing up excavation on mainline. Almost at final grade

Stabilized slope adjacent to future bridge abutment

Final finished grade adjacent to soil nail wall

Traffic on Highway 79 shifted over completed section of culvert