![](https://betterbeltline.com/wp-content/uploads/2020/01/pics_12_15_230_lrg.jpg)
Nearly-completed access road serving residences near Highway 79. Ramp to the mainline at the right
![](https://betterbeltline.com/wp-content/uploads/2020/01/pics_12_15_197_lrg.jpg)
Section at final grade with pneumatic concrete blanket and soil walls. Side drain pipes soon will be installed
![](https://betterbeltline.com/wp-content/uploads/2020/01/pics_12_15_173_lrg.jpg)
Finishing up excavation on mainline. Almost at final grade
![](https://betterbeltline.com/wp-content/uploads/2020/01/pics_12_15_149_lrg.jpg)
Stabilized slope adjacent to future bridge abutment
![](https://betterbeltline.com/wp-content/uploads/2020/01/pics_12_15_134_lrg.jpg)
Final finished grade adjacent to soil nail wall
![](https://betterbeltline.com/wp-content/uploads/2020/01/pics_12_15_242_lrg.jpg)
Traffic on Highway 79 shifted over completed section of culvert