December 2015 Construction Photos
Nearly-completed access road serving residences near Highway 79. Ramp to the mainline at
Nearly-completed access road serving residences near Highway 79. Ramp to the mainline at
COG members discussing project before the meeting. Barry Fagan, ALDOT Environmental
Side view of soil nail wall. It is 150 feet at the tallest
Excavator and bull dozer at work Loading Caterpillar 777 dump truck Retaining
Better Beltline Community Outreach Group and Environmental Stakeholders touring project on July 21,
Designers of future BNB projects during recent workshop and project tour.
Retaining wall, rock work area, and vegetated buffer, station 2232 looking west
East End (between stations 2210-2240) East End (between stations 2210-2240)
Drilling equipment and soil nail wall (at right) near station 2205
Construction materials staging area and detention basin near Highway 75 Exit