Exit ramp and future tie in at Highway 75
Soil Nail Wall
Temporary construction bridge over Self Creek
Construction access road. Berms divert runoff to sediment basins (off screen), applied hydraulic erosion control product, slope ready for excavation (right side), and minimized clearing on the left.